bedford - december 2021
The CHALLENGE.
Remove 80 legs of cantilever racking from site. After being offered the stock in July, our well priced offer sealed the deal. Lots of notice was given by the client, however the window to dismantle, palletise and remove the stock was tight.
The material.
Cantilever racking
the solution.
We drafted in two teams and 4 lorries! Safely dismantled and removed all product from site with a very happy customer.